Calleya Redevelopment
The City of Cockburn implements WSUD and structural BMP treatment trains for pre-treatment of stormwater prior to discharge to Atwell Drain.
Read MoreOld Blackmore Primary School
This is a compact subdivision designed in accordance with the City’s Urban Water Management Policy and Design Specifications. Use is made of verge swales and laneway soakwells.
Read MoreUrban Wetlands – Riverhaven Estate, West Martin
The Riverhaven Estate is a unique housing development located beside the Canning River in Martin. The development was project managed by Primewest and has been designed in accord with the site’s natural surrounds. The 10.5 ha development includes 108 residential lots ranging in size from 390 m2 to 803 m2.
Read More